Skip to content
Roll-off dumpsters in Miami-Dade, Broward and Palm Beach
EvergreenWaste & Recycling Corp

Remodel planning · South Florida

Kitchen Remodel Cost in South Florida, Plus the Debris Plan

Your kitchen remodel cost depends on one big decision: are you refreshing the room or gutting it? A cabinet-face and counter refresh lands in a very different bracket from moving plumbing and knocking out a wall. Here's what national cost data says, what pushes South Florida jobs up or down, and how to plan the cabinets, stone and tile that come out before anything new goes in.

  • National cost figures, clearly sourced
  • What moves the price in South Florida
  • What comes out of a kitchen tear-out
  • Which dumpster size fits
Call (954) 800-8901

Free quotes · Open 7 days, 7:30 AM to 9 PM · Based in Fort Lauderdale

By Evergreen Waste Team · Updated November 23, 2026

Renovated kitchen with a green island, pendant lights and white counters
  • Sizes10, 20, 30 and 40 yard
  • Hours7 days, 7:30 AM to 9 PM
  • AreaMiami-Dade, Broward, Palm Beach
  • QuotesFree, by phone or online

01 / 06

What does a kitchen remodel cost in South Florida?

National figures give a useful baseline. Remodeling magazine's 2025 Cost vs. Value report put a midrange minor kitchen remodel at roughly twenty-eight thousand dollars and a midrange major remodel at roughly eighty-three thousand. Local labor, condo rules and permits shift the final number.

The Cost vs. Value report, published each year by Remodeling magazine, prices a set list of sample projects across the country. These are its 2025 national averages, written in words and rounded. They're a third-party benchmark for planning, not our prices and not a contractor quote.

National kitchen remodel costs, Remodeling magazine 2025 Cost vs. Value report (rounded)
Project in the reportNational average job costWhat it roughly covers
Minor kitchen remodel, midrangeAbout twenty-eight thousand five hundred dollarsA refresh in the same layout: cabinet fronts and hardware, counters, sink, faucet, some appliances and flooring
Major kitchen remodel, midrangeAbout eighty-three thousand dollarsNew cabinets, island, counters, appliances, flooring and lighting in a full redo
Major kitchen remodel, upscaleAbout one hundred sixty-four thousand dollarsCustom cabinets, stone counters and high-end appliances

In practice, South Florida bids vary a lot from house to house. A 1960s ranch in Hollywood with original cast iron plumbing is a different job from a 2015 townhouse in Doral, even with the same cabinets. Get two or three written quotes with the same scope so you're comparing like for like.

02 / 06

What drives the cost of a kitchen remodel?

Layout changes cost the most, because moving plumbing, gas or walls brings in more trades and permits. After that come cabinets, countertop material, appliances and flooring. Building access, condo rules and how much debris comes out also affect the total.

What pushes a South Florida kitchen budget up or down
FactorWhy it matters
Same layout or new layoutKeeping the sink, range and fridge where they are avoids new plumbing, gas and electrical runs.
CabinetsRefacing or painting keeps boxes in place. New cabinets mean a full tear-out and more debris.
CountertopsLaminate is light to remove. Granite, quartz and marble are heavy and need a crew to carry out.
FlooringTile set in mortar over concrete slab takes time to break up and adds a lot of weight.
Walls and soffitsOpening a wall can mean structural work, an engineer and a longer permit review.
PermitsPlumbing, electrical and structural changes usually need a permit from your city or county building department.
Condo or HOA rulesWork hours, elevator bookings, loading dock time and debris rules can add days.
Debris removalBags in your car, a dump trailer or a dumpster: each has a cost in money or time.

Our honest take: if the budget is tight, keep the layout. The money you save on plumbing and permits can go into better cabinets or counters, which is what you see every day.

Pricing the tear-out?

Add debris removal to your budget early. Tell us the kitchen size and what's coming out, and we'll send a free dumpster quote.

(954) 800-8901

03 / 06

What debris comes out of a kitchen remodel?

A full kitchen tear-out produces cabinets, countertops, sink and fixtures, old appliances, flooring, drywall, backsplash tile and packaging from the new materials. Stone counters and tile set in mortar are the heaviest parts, and they fill a dumpster's weight allowance faster than bulky cabinets.

  • Cabinets and shelving: bulky but fairly light. Break them down flat to save space.
  • Countertops: laminate is light. Granite, quartz and other stone are heavy.
  • Backsplash and floor tile: heavy, especially with mortar and thinset attached.
  • Drywall and plaster: moderate weight, lots of volume.
  • Old appliances: fridges and ranges. Ask how they're handled before you load them.
  • Packaging: cardboard, foam and pallets from the new cabinets and appliances arrive after the tear-out.

Don't forget that last one. New cabinets for a mid-size kitchen arrive in a mountain of cardboard and foam, so keep space in the container for the install week as well as demolition.

04 / 06

How do you plan the debris for a kitchen remodel?

Decide the removal method before demolition day, book the container for the tear-out date, keep a clear path from the kitchen to the drop spot, and separate anything hazardous. Plan room for the install week's packaging so you don't need a second haul.

  1. 1List what's coming out: cabinets, counters, flooring, drywall, appliances.
  2. 2Pick a size. Most full kitchen remodels fit a 20 yard dumpster. A small refresh may fit a 10 yard.
  3. 3Choose the spot. A driveway usually needs no permit. A street or right-of-way spot usually does.
  4. 4If you live in a condo, check the association's rules on dumpsters, work hours and loading dock use.
  5. 5Book delivery a day or two before demolition. We usually deliver within 24 to 48 hours.
  6. 6Keep paint, solvents and other chemicals out of the container. They aren't accepted.
  7. 7Load heavy tile and stone low and spread out, then call for pickup when the job is done.

A standard rental runs about 7 days, and that covers most tear-outs. If cabinets are back-ordered and the install slips, ask for an extension instead of a second container.

05 / 06

Can you haul kitchen remodel debris yourself?

Yes, for small jobs. Eligible Miami-Dade residents can drop up to three cubic yards of construction debris a day at a county Trash and Recycling Center, and the Broward County Landfill takes construction debris by the ton. A full gut usually needs several trips.

In Miami-Dade, the county's 13 centers take construction debris for eligible addresses, capped at three cubic yards a day. Our Miami-Dade Trash and Recycling Centers rundown covers who qualifies. Bigger loads go to the North Dade or South Dade landfill for a per-ton fee, explained in our Miami-Dade dumps and landfills breakdown.

In Broward, the county landfill near U.S. 27 lists construction material at 100 dollars per ton on its 2026 rate sheet, with details in our Broward County Landfill roundup. A stone countertop and a tiled floor can take a pickup to its limit in one or two runs.

06 / 06

When is a dumpster the easier option for a kitchen remodel?

A dumpster is easier for any full tear-out, any job with stone counters or tiled floors, and any remodel that runs longer than a weekend. The crew loads straight from the kitchen, nothing piles up in the yard, and one haul clears it all.

Price depends on size, rental length, debris type and weight, and placement. Our dumpster rental prices explainer covers each factor, and street placement rules are in our dumpster permits notes.

Book the container before demo day

Tell us your demolition date and where the container can sit. We'll confirm a size and send a free quote anywhere in Miami-Dade, Broward or Palm Beach County.

(954) 800-8901

FAQ

Frequently asked questions

Do not see your question? Call our team.

(954) 800-8901
How much does a kitchen remodel cost in South Florida?

It depends mostly on scope. As a national benchmark, Remodeling magazine's 2025 Cost vs. Value report put a midrange minor kitchen remodel at about twenty-eight thousand five hundred dollars and a midrange major remodel at about eighty-three thousand. Local quotes vary with labor, permits and building rules.

What size dumpster do I need for a kitchen remodel?

Most full kitchen remodels fit a 20 yard dumpster. A small refresh, such as counters and a backsplash, may fit a 10 yard.

Can granite countertops go in a dumpster?

Yes. Stone is heavy, though, and counts against the container's weight allowance, so tell us about it when you request a quote. Overweight loads can cost extra.

Do I need a permit for a dumpster during my remodel?

Usually not if it sits on your private driveway. A permit is usually needed if it sits on a public street or right-of-way. Condos and HOAs may have their own rules.

Can I put old kitchen paint and cleaning chemicals in the dumpster?

No. Hazardous materials such as chemicals, paint, asbestos, batteries, tires and certain electronics are not accepted.

How long can I keep the dumpster?

A standard rental typically runs about 7 days, and extensions are available on request if the install runs late.

Planning a kitchen remodel?

Call (954) 800-8901 or request a free quote. We'll deliver the right dumpster before demolition day and haul it away when the old kitchen is out.

(954) 800-8901

Monday to Sunday, 7:30 AM to 9:00 PM

Call now