What does a kitchen remodel cost in South Florida?
National figures give a useful baseline. Remodeling magazine's 2025 Cost vs. Value report put a midrange minor kitchen remodel at roughly twenty-eight thousand dollars and a midrange major remodel at roughly eighty-three thousand. Local labor, condo rules and permits shift the final number.
The Cost vs. Value report, published each year by Remodeling magazine, prices a set list of sample projects across the country. These are its 2025 national averages, written in words and rounded. They're a third-party benchmark for planning, not our prices and not a contractor quote.
| Project in the report | National average job cost | What it roughly covers |
|---|---|---|
| Minor kitchen remodel, midrange | About twenty-eight thousand five hundred dollars | A refresh in the same layout: cabinet fronts and hardware, counters, sink, faucet, some appliances and flooring |
| Major kitchen remodel, midrange | About eighty-three thousand dollars | New cabinets, island, counters, appliances, flooring and lighting in a full redo |
| Major kitchen remodel, upscale | About one hundred sixty-four thousand dollars | Custom cabinets, stone counters and high-end appliances |
In practice, South Florida bids vary a lot from house to house. A 1960s ranch in Hollywood with original cast iron plumbing is a different job from a 2015 townhouse in Doral, even with the same cabinets. Get two or three written quotes with the same scope so you're comparing like for like.
02 / 06
What drives the cost of a kitchen remodel?
Layout changes cost the most, because moving plumbing, gas or walls brings in more trades and permits. After that come cabinets, countertop material, appliances and flooring. Building access, condo rules and how much debris comes out also affect the total.
| Factor | Why it matters |
|---|---|
| Same layout or new layout | Keeping the sink, range and fridge where they are avoids new plumbing, gas and electrical runs. |
| Cabinets | Refacing or painting keeps boxes in place. New cabinets mean a full tear-out and more debris. |
| Countertops | Laminate is light to remove. Granite, quartz and marble are heavy and need a crew to carry out. |
| Flooring | Tile set in mortar over concrete slab takes time to break up and adds a lot of weight. |
| Walls and soffits | Opening a wall can mean structural work, an engineer and a longer permit review. |
| Permits | Plumbing, electrical and structural changes usually need a permit from your city or county building department. |
| Condo or HOA rules | Work hours, elevator bookings, loading dock time and debris rules can add days. |
| Debris removal | Bags in your car, a dump trailer or a dumpster: each has a cost in money or time. |
Our honest take: if the budget is tight, keep the layout. The money you save on plumbing and permits can go into better cabinets or counters, which is what you see every day.
Pricing the tear-out?
Add debris removal to your budget early. Tell us the kitchen size and what's coming out, and we'll send a free dumpster quote.
03 / 06
What debris comes out of a kitchen remodel?
A full kitchen tear-out produces cabinets, countertops, sink and fixtures, old appliances, flooring, drywall, backsplash tile and packaging from the new materials. Stone counters and tile set in mortar are the heaviest parts, and they fill a dumpster's weight allowance faster than bulky cabinets.
- Cabinets and shelving: bulky but fairly light. Break them down flat to save space.
- Countertops: laminate is light. Granite, quartz and other stone are heavy.
- Backsplash and floor tile: heavy, especially with mortar and thinset attached.
- Drywall and plaster: moderate weight, lots of volume.
- Old appliances: fridges and ranges. Ask how they're handled before you load them.
- Packaging: cardboard, foam and pallets from the new cabinets and appliances arrive after the tear-out.
Don't forget that last one. New cabinets for a mid-size kitchen arrive in a mountain of cardboard and foam, so keep space in the container for the install week as well as demolition.
04 / 06
How do you plan the debris for a kitchen remodel?
Decide the removal method before demolition day, book the container for the tear-out date, keep a clear path from the kitchen to the drop spot, and separate anything hazardous. Plan room for the install week's packaging so you don't need a second haul.
- 1List what's coming out: cabinets, counters, flooring, drywall, appliances.
- 2Pick a size. Most full kitchen remodels fit a 20 yard dumpster. A small refresh may fit a 10 yard.
- 3Choose the spot. A driveway usually needs no permit. A street or right-of-way spot usually does.
- 4If you live in a condo, check the association's rules on dumpsters, work hours and loading dock use.
- 5Book delivery a day or two before demolition. We usually deliver within 24 to 48 hours.
- 6Keep paint, solvents and other chemicals out of the container. They aren't accepted.
- 7Load heavy tile and stone low and spread out, then call for pickup when the job is done.
A standard rental runs about 7 days, and that covers most tear-outs. If cabinets are back-ordered and the install slips, ask for an extension instead of a second container.
05 / 06
Can you haul kitchen remodel debris yourself?
Yes, for small jobs. Eligible Miami-Dade residents can drop up to three cubic yards of construction debris a day at a county Trash and Recycling Center, and the Broward County Landfill takes construction debris by the ton. A full gut usually needs several trips.
In Miami-Dade, the county's 13 centers take construction debris for eligible addresses, capped at three cubic yards a day. Our Miami-Dade Trash and Recycling Centers rundown covers who qualifies. Bigger loads go to the North Dade or South Dade landfill for a per-ton fee, explained in our Miami-Dade dumps and landfills breakdown.
In Broward, the county landfill near U.S. 27 lists construction material at 100 dollars per ton on its 2026 rate sheet, with details in our Broward County Landfill roundup. A stone countertop and a tiled floor can take a pickup to its limit in one or two runs.
06 / 06
When is a dumpster the easier option for a kitchen remodel?
A dumpster is easier for any full tear-out, any job with stone counters or tiled floors, and any remodel that runs longer than a weekend. The crew loads straight from the kitchen, nothing piles up in the yard, and one haul clears it all.
- Our 20 yard dumpster is the usual pick for a full kitchen remodel.
- Smaller refreshes and single-room jobs often fit a 10 yard dumpster.
- Contractors running several remodels can use our construction dumpster rental service.
- Need the kitchen torn out for you? Our interior demolition in Miami crew handles cabinets, counters and walls, and our tile removal team breaks up old floors.
Price depends on size, rental length, debris type and weight, and placement. Our dumpster rental prices explainer covers each factor, and street placement rules are in our dumpster permits notes.
Book the container before demo day
Tell us your demolition date and where the container can sit. We'll confirm a size and send a free quote anywhere in Miami-Dade, Broward or Palm Beach County.